Our Project
Operation Neethiman
Project Summary
A fishing boat ‘Neethiman’ sank in the shipping channel between Vypeen and Fort Kochi in the morning of 19th September 2017. The mishap occurred when the boat, which developed a crack in its hull, was being towed to the harbor using another boat engaged by Marine Enforceme...
Installation of Unloading Arm for Cochin LNG Project
Project Summary
LNG unloading arms are the most important and critical unit equipped in the LNG receiving terminal, which require a higher stability for its installation to avoid any potential damages or leakage during the unloading of LNG from ship Usually these ULA's installed placing cranes o...
Relocation of the DP World's Equipments from RGTC to ICTT
Project Summary
India Gateway Terminal Pvt. Limited (DP World, Cochin) has awarded a turnkey project to M/s LOTS Shipping Limited, a Cochin based shipping Company to move two numbers of Mobile Harbour Cranes (MHC) and four numbers of Rubber Tyre Gantry (RTG) from their old facility at Rajiv G...
SUDAN Pusher Tug Project Master Shipyard Pvt. Limited
Project Summary
Master Shipyard Pvt. Limited, Cochin an associate company of LOTS Shipping Limited entered into an agreement with Tristar Energy for River Transport Limited, Khartoum, Sudan for the construction and launching of a 28 M pusher Tug on the White Nile in Sudan. The hull of the Tu...
Boat Discharge at Djibouti
Project Summary
Two PT Boats for the Yemeni Coast Guard were discharged at Djibouti Port from the Ship MV Marilyn The discharge of these boats were carried out successfully during March 2011 using the crane vessel MV JAN. The biggest challenge was positioning the MV Jan's derricks to properl...